CO 12 Safety Improvements in Weston

Project Complete

About the Project

Work will include:

  • 16-foot widening with full-depth reclamation and reconstruction of the highway
  • Pulverizing and reusing all roadway layers into new hot mix asphalt paving

Other aspects of the project include:

  • 4-foot shoulder widening
  • 12-foot eastbound passing lane construction
  • Culvert repairs
  • New pavement markings
  • Signage

Project Facts

  • Construction Cost: $3.5 million
  • Contractor: United Companies
  • Timeline: April 2026 to September 2026
  • Location: CO 12 
    • Nearest Town/City: Weston
    • Mile Point(s): MP 46.7 to MP 48
    • County: Las Animas

Project Benefits

  • New passing lanes provides ample space and opportunities to bypass slower traffic safely
  • New asphalt adds years of life to the highway
    • Increased durability and resistance of ruts and road damage
    • Provides a smoother road surface for motorists

Work Schedule

  • Daytime work hours are Monday through Friday from 7 a.m. to 7 p.m. beginning April 13, 2026.

Traffic Impacts

Traffic impacts will include:

  • 24/7 one-lane alternating traffic guided by traffic control during the day
  • A temporary portable traffic signal at night and on weekends
  • Up to 15-minute delays
  • 12-foot width restriction
  • Speed reduction
  • Refer to COtrip.org for real-time travel conditions and road closures