CO 74 Resurfacing in Evergreen

Project Complete

About the Project

The project will consist primarily of roadway resurfacing which will include a mill and overlay.

Additional operations will include:

  • Utility upgrades
  • Shoulder widening
  • Guardrail removal and replacement
  • Concrete curb ramp upgrades to meet Americans with Disabilities Act standards
  • Bridge rehabilitation work over Bear Creek.

Project Facts

  • Construction Cost: $6.5 million
  • Contractor: Brannan Sand and Gravel
  • Timeline: May 2026 to October 2026
  • Location: CO 74
    • Nearest Town/City: Evergreen
    • Mile Point(s): MP 6.9 to MP 12.5
    • County: Jefferson

Project Benefits

  • Resurfacing efforts will provide a smoother driving experience. Studies show an even roadway surface decreases everyday wear-and-tear on vehicles and allows for better driver control in variable weather conditions.
  • Upgraded curb ramps will enhance pedestrian accessibility for those who walk, roll and stroll through the corridor.
  • Guardrail replacements will offer added safety benefits to motorists traveling along the winding mountain highway.

Work Schedule

  • Construction will start in May and continue through Fall 2026
  • General working hours are Monday through Friday from 7 a.m. to 7 p.m.
  • Milling and paving operations on the west end of the project zone through the town of Evergreen will occur overnight from Sunday night through Friday morning, 8 p.m. to 7 a.m.
  • All other operations are anticipated to take place during daytime hours

Traffic Impacts

  • Motorists can expect daily traffic shifts and single-lane closures with one through-lane maintained most days
  • Sections of the highway will be reduced to a single lane with flagging operations periodically throughout the project
  • Business and residential access will be maintained during daytime hours with temporary restrictions during milling and paving operations
    • All affected properties will be notified prior to any access interruptions.
  • Sidewalk access will be restricted intermittently through downtown Evergreen with pedestrian detour routes in place
  • The highway will narrow to 12 feet at several locations
  • Various speed reductions will be in place for the duration of the project
  • Motorists are encouraged to account for up to 15 minutes of extra travel time when driving the corridor. Additional projects in the area may add to congestion
  • Drivers should use extra caution around cyclists on lane-restricted roadways, particularly during summer months when cyclist traffic increases
  • Refer to COtrip.org for real-time travel conditions and road closures