I-70 Bridge Repairs at Kipling & Garrison

Project Complete

About the Project

The Colorado Department of Transportation and its contracting partner, Myers and Sons Construction, have completed repairs to three bridges on Interstate 70 in Jefferson County. Improvements included the eastbound and westbound I-70 bridges over Kipling Street (Colorado Highway 391) and the westbound bridge over Garrison Street.
On the bridges over Kipling Street, crews used hydrodemolition, a process that uses high-pressure water to remove damaged concrete and prepare bridge decks for repairs. Concrete restoration and deck improvements will help extend the life of the structures. Traditional bridge rehabilitation work on the westbound I-70 bridge over Garrison Street also improved its condition.

Two extended weekend closures of I-70 in September allowed crews to complete major repairs to the bridges over Kipling Street. The closures allowed crews to work without interruption and helped reduce traffic impacts throughout the project. During the closures, I-70 traffic was directed onto the Kipling Street on- and off-ramps before returning to the interstate. Crews widened the ramps to allow traffic to safely travel through the interchange during the closures.

Following the closures, crews completed the remaining bridge repairs and roadway improvements. Work included asphalt paving, waterproofing, pavement striping and the installation of roadway signs and delineators. Crews also restored roadway areas affected by the temporary detours, improved curbs and gutters at the Kipling Street ramps, returned the ramps to their final configuration and installed measures to help prevent soil erosion.

The completed improvements will help extend the life of the bridges and support safer, more reliable travel along I-70. By addressing aging infrastructure, the project helps protect these important structures from further deterioration and maintain a dependable route for residents, commuters and commercial vehicles traveling through the area.

Project Facts

  • Construction Cost: $5 million
  • Contractor: Myers and Sons Construction
  • Timeline: August 2026 to November 2026
  • Location: I-70 
    • Nearest Town/City: Arvada and Wheat Ridge
    • Mile Point(s): MP 267 to MP 268
    • County: Jefferson

I-70 Live Camera Feeds

These camera feeds are intended to help motorists view current traffic conditions and identify congestion related to construction at I-70 and Kipling Street. They are not intended to display construction activities or future construction information.


Project Benefits

  • Complete repairs safely while maintaining access through the corridor
  • Preserve critical infrastructure and reduce the need for more extensive repairs in the future
  • Bridge repairs will preserve and improve this vital transportation route, ensuring the corridor remains reliable for the trucking industry, local communities and the traveling public

Work Schedule

  • Overnight work is scheduled from 7 p.m. to 6 a.m., Sunday through Thursday
  • Construction schedules may be impacted by weather and other unanticipated delays
  • Additional overnight work may be required on Friday and Saturday

Traffic Impacts

  • Single and double lane closures on eastbound and westbound I-70
  • Alternating lane closures on northbound and southbound Kipling Street
  • Ramp closures at I-70 and Kipling Street may be required to return the ramps to original configuration
  • Refer to COtrip.org for real-time travel conditions and road closures