I-70 Palisade Curves Study

Study complete

Project Facts

  • Consultant: Tsiouvaras Simmons Holderness (TSH)
  • Timeline: April - October 2019
  • Location:
    The Palisade Curves project area includes the following:
    1. I-70 between mile points (MP) 40.5 and 46;
    2. US 6 between MP 43 and 46;
    3. interchanges at exit 42 (full interchange), exit 44 (half interchange) and exit 46 (full interchange);
    4. the intersection at Rapid Creek Road/US 6 and county roads; and
    5. the I-70 bridge over the Colorado River (structure H-03-AY).

About

A project team is reviewing the operations, safety and sustainability of the I-70/US 6 highway system through the east end of Palisade. Accident history data have been collected, and traffic studies and structural inspections within this area have been done.

CDOT seeks to fully understand concerns and issues for the transportation system and local community so that an informed decision can be made regarding future improvements for this area.


Project Goals

  • Improve overall traffic operations along I-70 within project area.
  • Improve safety, trip reliability and travel time through the corridor.
  • Improve riding surface through the corridor.
  • Adhere to all environmental compliance requirements.

Transportation Alternatives

  • The team will develop and evaluate improvement alternatives, including a no-action alternative—aka, make no changes—for I-70 within the project area.
  • The team will produce an alternative analysis evaluation and report to identify existing conditions and anticipated problem areas, as well as develop a range of I-70 alignment alternatives to improve operations and safety of the corridor for all modes of transportation.
  • The results of these efforts may ultimately be used to prepare a National Environmental Policy Act (NEPA) document and final design.

Project Elements

  • bridge structure evaluation
  • traffic operational and safety assessments
  • potential geotechnical impacts
  • potential hydraulic impacts to the Colorado River, Government Highline Canal, Orchard Mesa Canal
  • appropriate NEPA documentation as directed by the chosen preferred alternative
  • preliminary design of selected preferred alternative



Public Involvement

Public Open House

Join the project team for this open house to discuss the I-70 Palisade Curves study.

5-7 p.m.
Thursday, Nov. 29
Palisade Community Center
120 W. 8th St.
Downstairs Meeting Room
Questions? Call 970-628-6090.

Share Your Comments

CDOT is reviewing the operations, safety and sustainability of the highway system in the east end of Palisade. Accident history data have been collected, and traffic studies and structural inspections within this area have been done.

CDOT seeks to fully understand concerns and issues for the transportation system and local community so it can make an informed decision regarding future improvements for this area. Please help us by providing your comments here regarding current and potential future issues or concerns in the project area.

Add a page with this disclamer to the “comment map” tab - soon, a link to the interactive map will be provided.)

Instructions to Participate

  • Use this map to leave comments about specific location or general ideas. Read the disclaimer below and accept to enter the map.
  • Use the map to navigate to your area of interest. Click the lightbulb/pencil icon in the upper-left toolbar to activate the comment tool.
  • Follow the directions to comment.

Leave a private comment by emailing [email protected] or calling 970-628-6090.