US 24, CO 17 and US 160 Culvert Repair

Project Facts
 

  • Cost:
    $1.5 million

From September to December 2016, crews repaired culverts on three highways: US 24, CO 17 and US 160.

Work included hydraulic assessment, and improvement and repair work at the following locations:

  • US 24: mile post 206.23
  • CO 17: mile post 3.18
  • US 160: mile post 3.67