US 50 Orchard Mesa Resurfacing

Project Facts
 

  • Cost:
    $5.4 million

Project Team

  • Contractor(s): Old Castle
    United

Completed from March to September 2016, this project resurfaced a five-mile stretch of US 50 in the southern part of Grand Junction from Pitkin Avenue, south to 29 Road. The goal was to make the road safer and smoother for motorists.

Other work included:

  • median construction
  • guardrail upgrades
  • other minor roadway repairs
  • bridge rail and sidewalk curb repair, and deck resurfacing and rehabilitation,