US 24 Resurfacing North of Buena Vista

Project Complete

About the Project

Work will include:

  • Resurfacing the highway
  • Rumble strip installation
  • Guardrail improvements
  • Road sign replacement
  • Striping

Project Facts

  • Construction Cost: $6.5 million
  • Contractor: United Companies
  • Timeline: May 2026 to September 2026
  • Location: US 24 
    • Nearest Town/City: Buena Vista
    • Mile Point(s): MP 192 to MP 202
    • Counties: Chaffee and Lake

Project Benefits

  • The resurfacing improvements will extend the life of the roadway, enhance safety and deliver a smoother, more reliable ride for motorists
  • Additional benefits of the project include:
    • Installation of new guardrail that will be 31 inches high, designed to meet updated safety standards
    • Higher railing will help vehicles that veer off course remain on the roadway more effectively, making this corridor safer for the traveling public

Work Schedule

  • Daytime hours are Monday through Friday from 7 a.m. to 7 p.m.

Traffic Impacts

Motorists can expect the following impacts during the period of construction:

  • Vehicles will be reduced to single-lane alternating traffic guided by pilot vehicles and flagging personnel
  • Motorists can expect up to 15 minute delays
  • 12 feet width restrictions will be in place through the duration of the project
  • Speeds will be reduced to 40 MPH through the work zone
    • Traffic fines will be doubled
  • Motorist should slow down as they approach the work zone, drive with caution, allow extra space between vehicles and give themselves extra travel time
  • Refer to COtrip.org for real-time travel conditions and road closures