This project involves the replacement of traffic signal equipment at the two ramp intersections, including traffic signal poles and cabinets. An overhead ramp meter signal will be added to the westbound on-ramp. Curb ramps, median islands, and sidewalk geometry will be improved to meet the Americans with Disabilities Act (ADA) standards and enhance bicycle navigation through the eastern intersection.
Work this Week & Lane Closures for C-470 & Bowles Avenue Interchange Improvements
Project Facts
- Construction Cost: $3.3 million
- Contractor: Jalisco International
- Timeline: August 2026 to February 2027
- Location: C-470
- Nearest Town/City: Morrison
- Mile Point(s): MP 7.5 to MP 8.2
- County: Jefferson
Project Benefits
This project will provide much needed upgrades to the traffic signals at this intersection, as well as improving the roadway and drainage systems.
Work Schedule
- Monday through Friday from 8:30 a.m. to 3:30 p.m.
Traffic Impacts
- Various single lane and shoulder closures will be in place within the work zone
- Bicyclists using the C-470 Bikeway will be detoured around the Bowles Avenue intersection using Alkire Street and Coal Mine Avenue
- Motorists are urged to drive with caution, heed all signs and leave plenty of following distance when traveling through the area
- Refer to COtrip.org for real-time travel conditions and road closures