CO 115 Penrose Concrete Preventive Maintenance
About the Project
The project will consist of the replacement of full and partial concrete pavement roadway panels. This maintenance project also involves comprehensive concrete repairs including:
- Fixing localized surface damage
- Crack sealing
- Placing steel bars to keep concrete from moving
- Diamond grinding to create a smoother surface
Crews will also conduct the following work:
- Striping
- Guardrail replacement
Work this Week & Lane Closures for CO 115 Concrete Preventive Maintenance
Project Facts
- Construction Cost: $3.6 million
- Contractor: Acme Concrete Paving
- Timeline: March 2026 to September 2026
- Location: CO 115
- Nearest Town/City: Penrose
- Mile Point(s): MP 14 to MP 19
- County: Fremont
Project Benefits
This project will provide benefits to the public, including:
- Adds years of life to the highway
- Provides a smoother road surface
- Improves durability by increasing the resistance of ruts and road damage
Work Schedule
To be announced.
Traffic Impacts
- To be announced
- Refer to COtrip.org for real-time travel conditions and road closures
