CO 12 Safety Improvements in Weston

About the Project

Work will include:

  • 16-foot widening with full-depth reclamation and reconstruction of the highway
  • Pulverizing and reusing all roadway layers into new hot mix asphalt paving

Other aspects of the project include:

  • 4-foot shoulder widening
  • 12-foot eastbound passing lane construction
  • Culvert repairs
  • New pavement markings
  • Signage

Work this Week & Lane Closures for CO 12 Safety Improvements in Weston

Project Facts

  • Construction Cost: $3.5 million
  • Contractor: United Companies
  • Timeline: April 2026 to September 2026
  • Location: CO 12 
    • Nearest Town/City: Weston
    • Mile Point(s): MP 46.7 to MP 48
    • County: Las Animas
Map of the CO 12 Safety Improvement Project limits in Weston from MP 46.7 to MP 48
Map of the CO 12 Safety Improvement Project limits in Weston from MP 46.7 to MP 48

Project Benefits

  • New passing lanes provides ample space and opportunities to bypass slower traffic safely
  • New asphalt adds years of life to the highway
    • Increased durability and resistance of ruts and road damage
    • Provides a smoother road surface for motorists

Work Schedule

  • Daytime work hours are Monday through Friday from 7 a.m. to 7 p.m. beginning April 13, 2026.

Traffic Impacts

Traffic impacts will include:

  • 24/7 one-lane alternating traffic guided by traffic control during the day
  • A temporary portable traffic signal at night and on weekends
  • Up to 15-minute delays
  • 12-foot width restriction
  • Speed reduction
  • Refer to COtrip.org for real-time travel conditions and road closures