CO 141 Resurfacing near Gateway

About the Project

The resurfacing project will improve approximately 13 miles of CO 141 from Mile Point 107, Larsen Canyon south of Gateway, to MP 120, Turner Gulch north of Gateway.

Work will include:

  • Asphalt overlay paving (two applications)
  • Guardrail replacement
  • Bridge deck repairs at four locations:
    • MP 110.5
    • MP 110.92
    • MP 112.4
    • MP 115.6

Work this Week & Lane Closures on CO 141 near Gateway

Project Facts

  • Construction Cost: $ 8 million
  • Contractor: Elam Construction
  • Timeline: July 2025 to October 2025
  • Location: CO 141 
    • Nearest Town/City: Gateway
    • Mile Point(s): MP 107 to MP 120
    • County: Mesa County
CO 141 Resurfacing near Gateway project map
Map of locations for the CO 141 Resurfacing Project near Gateway from MP 107 to MP 115.6.

Project Benefits

  • The new asphalt will add years of life to the highway
    • Provide a smoother road surface
    • Add durability by increasing the resistance of ruts and road damage
  • The new guardrail will be 31 inches high
    • Designed to meet new safety standard requirements
    • The higher railing will help veering vehicles remain on the road more effectively, making the highway safer for the traveling public

Work Schedule

  • Monday through Friday from 7 a.m. to 7 p.m.

Traffic Impacts

Motorists can expect the following impacts during the period of construction:

  • One-lane alternating traffic guided by pilot car
  • 20-minute delays
  • 10-foot width restriction
  • Speed reduction to 35 MPH
  • Travelers will encounter a 24/7 one-lane alternating traffic guided by a temporary portable traffic signal for bridge repair
  • Refer to COtrip.org for real-time travel conditions and road closures