CO 14 Signal Installation at CR 5

About the Project

A new signalized intersection is planned for CO 14 and CR 5 with a new north to south pedestrian crossing at CO 14 and CR 5.

Other planned improvements include:

  • New striping, signage and delineators at Camino Real and CO 14
  • Three-quarter movement intersection at Camino Real for westbound right turns, southbound right turns and eastbound left turns
  • Southbound left turns from Camino Real onto CO 14 will be discontinued
    • Southbound vehicles wishing to turn left (eastbound) onto CO 14 can continue to do so via Camino Del Mundo and CO 14 at the existing signal

Work this Week & Lane Closures for CO 14 Signal Installation at CR 5

Project Facts

  • Construction Cost: $434,118
  • Contractor: Adiona
  • Timeline: August 2025 to September 2025
  • Location: Highway(s) and specific location 
    • Nearest Town/City: 
    • Mile Point(s): MP 140.03 
    • County: Larimer

Project Benefits

With all modes of travel interacting on this stretch of highway at once, a new signalized intersection will create a safer environment and more efficient flow of traffic for everyone.


Work Schedule

  • Monday through Friday, 8 a.m. to 5 p.m.

Traffic Impacts

Motorists can expect the following impacts during the period of construction:

  • Shoulder closures
  • Single-lane closures
  • Refer to COtrip.org for real-time travel conditions and road closures