CO 157 Pavement Rehabilitation
About the Project
The Colorado Department of Transportation and prime contractor Acme Concrete Paving Inc., will be performing a concrete rehabilitation project on CO 157 (Foothills Parkway) in the City and County of Boulder. Construction will take place between CO 119 and Pearl Parkway (Mile Point 2.73 to MP 4.52.)
Major work components will include:
- Removal of existing concrete panels
- Pouring and curing new concrete panels
- Diamond grinding
- Sign replacements
- Guardrail upgrades
Work this Week & Lane Closures CO 157 Pavement Rehabilitation
Project Facts
- Construction Cost: $4.3 million
- Contractor: Acme Concrete Paving Inc.
- Timeline: March 2026 to September 2026
- Location: CO 157
- Nearest Town/City: Boulder
- Mile Point(s): MP 2.1 to MP 4.53
- County: Boulder
Project Benefits
- Prolong the service life of the roadway
- Help resist weather and stress related deterioration
- Reducing road irregularities through diamond grinding operations
- Provide a smoother ride for motorists
- Decrease general wear-and-tear on vehicles
- Guardrail upgrades enhance driver safety throughout the project corridor
Work Schedule
- General working hours will take place weekday nights from 7 p.m. to 7 a.m.
- Additional daytime and weekend work is expected intermittently
Traffic Impacts
- General working hours will take place from 7 p.m. to 7 a.m., Monday night through Friday night.
- Additional daytime and weekend work is expected intermittently.
- Motorists will encounter single-lane closures on CO 157 during weeknights, with one lane of traffic open in each direction.
- Initial concrete panel replacements require weekend work in addition to weeknight operations. Motorists can expect various nighttime and daytime closures for the first six to eight weekends of the project.
- Full closures are expected during several weekends on CO 157. These will occur one direction at a time and during weekends only to reduce impacts to weekday commuters.
- Alternate routes are advised during peak travel times and periods of full directional closures.
- The Pearl Parkway on and off-ramps at CO 157 will experience intermittent closures with detour routes. These closures are expected to be minimal throughout the project’s duration.
- While significant delays are not anticipated, motorists are encouraged to account for up to 10 minutes of extra travel time.
- Please be aware of additional ongoing road construction projects in the area. Teams will coordinate closures to minimize impacts to the traveling public.
- Refer to COtrip.org for real-time travel conditions and road closures.