CO 165 Bridge Replacement
About the Project
The work includes:
- Place a concrete bridge culvert at the realigned Willis Creek channel location
- Replace the corrugated culverts at the site of the existing Willis Creek crossing
Project Facts
- Construction Cost: To be announced
- Contractor: Siete, Inc.
- Timeline: October 2026 to April 2027
- Location: CO 165
- Nearest Town/City: Colorado City
- Mile Point(s): MP 16.3 to MP 16.43
- County: Custer
Project Benefits
To be determined.
Work Schedule
To be announced.
Traffic Impacts
- To be announced
- Refer to COtrip.org for real-time travel conditions and road closures