CO 165 Bridge Replacement

About the Project

The work includes:

  • Place a concrete bridge culvert at the realigned Willis Creek channel location
  • Replace the corrugated culverts at the site of the existing Willis Creek crossing

Project Facts

  • Construction Cost: To be announced
  • Contractor: Siete, Inc.
  • Timeline: October 2026 to April 2027
  • Location: CO 165 
    • Nearest Town/City: Colorado City
    • Mile Point(s): MP 16.3 to MP 16.43
    • County: Custer

Project Benefits

To be determined.


Work Schedule

To be announced.


Traffic Impacts

  • To be announced