CO 348 Delta Olathe Resurfacing

About the Project

The project will take place in two different locations:

  • CO 348 - Work includes:
    • Bridge repairs
    • Culvert repairs
    • Roadway resurfacing
  • US 50 from CO 92 intersection through downtown Delta to Confluence Drive intersection - Work includes:
    • Milling and paving operations

Project Facts

  • Construction Cost: $10 million
  • Contractor: United Companies
  • Timeline: November 2026 to May 2027
  • Location: CO 92, CO 348 and US 50
    • Nearest Town/City: Delta
    • Mile Point(s): MP 0.3 to MP 17.059
    • County: Delta

Project Benefits

  • Improved culvert infrastructure along CO 348
  • Smoother driving surface through downtown Delta and on CO 348
  • Better water flow through new concrete box culvert of CO 348

Work Schedule

To be announced.


Traffic Impacts

  • To be announced
  • Refer to COtrip.org for real-time travel conditions and road closures