CO 348 Delta Olathe Resurfacing
About the Project
The project will take place in two different locations:
- CO 348 - Work includes:
- Bridge repairs
- Culvert repairs
- Roadway resurfacing
- US 50 from CO 92 intersection through downtown Delta to Confluence Drive intersection - Work includes:
- Milling and paving operations
Project Facts
- Construction Cost: $10 million
- Contractor: United Companies
- Timeline: November 2026 to May 2027
- Location: CO 92, CO 348 and US 50
- Nearest Town/City: Delta
- Mile Point(s): MP 0.3 to MP 17.059
- County: Delta
Project Benefits
- Improved culvert infrastructure along CO 348
- Smoother driving surface through downtown Delta and on CO 348
- Better water flow through new concrete box culvert of CO 348
Work Schedule
To be announced.
Traffic Impacts
- To be announced
- Refer to COtrip.org for real-time travel conditions and road closures