CO 35 Resurfacing & Bridge Maintenance

About the Project

The project consists of resurfacing CO Highway 35 (Quebec Street) from Mile Point 8.7 to MP 8.87 as well as bridge structure maintenance and Americans with Disabilities Act (ADA) ramp improvements. By proactively addressing minor issues like corrosion or deck deterioration before they become critical, it prevents, rather than just repairs, structural failure, ensuring reliable transportation infrastructure.

Work this Week & Lane Closures for CO 35 Resurfacing & Bridge Maintenance

Project Facts

  • Construction Cost: $3.7 million
  • Contractor: Structures, Inc.
  • Timeline: August 2026 to March 2027
  • Location: CO 35 
    • Nearest Town/City: Denver
    • Mile Point(s): MP 8.7 to MP 8.87
    • County: Denver

Project Benefits

Benefits of this project include:
  • A smooth road or highway
    • Improves safety and quality for driving experience
  • Bridge preventative maintenance
    • Ensures public safety
    • Extends the structural life of bridges
    • Minimizes long-term repair costs

Work Schedule

To be announced.


Traffic Impacts

  • To be announced
  • Refer to COtrip.org for real-time travel conditions and road closures