Signal Improvements on CO 47 & US 50

About the Project

The project consists of:

  • installing new signals
  • Hot Mix Asphalt paving
  • Concrete flatwork
  • Minor widening
  • Minor intersection safety improvements

Project Area

Map of signal improvement location on US 50 and 27th Lane at Mile Point 5.362
Map of signal improvement location on US 50 and 27th Lane at Mile Point 5.362.
Map of signal improvements on CO 47 near Pete Jimenez Parkway at Mile Point 3.78.
Map of signal improvements on CO 47 near Pete Jimenez Parkway at Mile Point 3.78.

Project Facts

  • Construction Cost: $2.7 million
  • Contractor: Morton Electric, Inc
  • Timeline: October 2026 to March 2027
  • Location: CO 47, US 50 
    • Nearest Town/City: Pueblo
    • Mile Point(s): MP 3.781
    • County: Pueblo

Project Benefits

The surface treatment will improve traffic flow for motorists and enhance pedestrian safety at crosswalks.

Work Schedule

To be announced.


Traffic Impacts

  • To be announced
  • Refer to COtrip.org for real-time travel conditions and road closures