CO 63 Resurfacing North & South of Akron

Project Complete

About the Project

All project work on CO 63 has now concluded.

Throughout the project, the Colorado Department of Transportation and contractor Simon have improved approximately nine miles of CO 63 between Mile Points 25 and 34. The $\$7.9$ million project included resurfacing, guardrail replacement, shoulder grading and erosion control measures. These improvements have created a smoother, safer and more durable roadway that will better serve travelers and extend the life of this important corridor.

CDOT and Simon thank the Town of Akron, area travelers and our email subscribers for their patience, cooperation and interest throughout the project.

Project Facts

  • Construction Cost: $7.9 million
  • Contractor: Simon
  • Timeline: Project concluded on Oct. 15, 2025
  • Location: CO 63 
    • Nearest Town/City: Akron
    • Mile Point(s): MP 25.1 to MP 34.3
    • County: Washington
Map of CO 63 Resurfacing Project in Akron
Map of CO 63 Resurfacing Project location in Akron from MP 25.1 to MP 34.3.

Project Benefits

  • Resurfacing will provide a smoother ride and prolong the life of the road surface
  • Shoulder work will provide improved erosion control and added safety with guardrail replacements

Work Schedule

There is no further work as this project is complete.


Traffic Impacts

The project is complete; there are no further traffic impacts.