The Colorado Department of Transportation and prime contractor, Simon, will begin a resurfacing project in early June along Colorado Highway 63, north and south of the Town of Akron.

This resurfacing project will include milling, pavement overlay, striping, and signage installation. In some areas, shoulders will be graded to create a more gradual slope from the pavement, erosion control measures will be installed, and guardrail will be replaced.

This $7.9 million dollar project is expected to start the week of June 2, 2025 and continue through October, 2025. Approximately nine miles of CO 63 will be improved, from Mile Point 25.1 south of Akron to Mile Point 34.3 north of town.

Work this Week & Lane Closures on CO 63 in Akron

Project Facts

  • Construction Cost: $7.9 million
  • Contractor: Simon
  • Timeline: June 2025 to October 2025
  • Location: CO 63 
    • Nearest Town/City: Akron
    • Mile Point(s): MP 25.1 to MP 34.3
    • County: Washington
Map of CO 63 Resurfacing Project in Akron
Map of CO 63 Resurfacing Project location in Akron from MP 25.1 to MP 34.3.

Project Benefits

  • Resurfacing will provide a smoother ride and prolong the life of the road surface
  • Shoulder work will provide improved erosion control and added safety with guardrail replacements

Work Schedule

  • Work is expected to occur from early June through October 2025
  • Work will occur during daylight hours, Monday to Friday, with a potential for some Saturday work

Traffic Impacts

Motorists can expect the following impacts during the period of construction:

  • Vehicular travel will be reduced to a single-lane, alternating traffic intermittently in either direction, throughout the duration of the project during daylight hours
    • The roadway will return to normal operation each evening
  • Lane closures, guided by flaggers and pilot cars, will have up to 15-minute delays
  • Work will occur in segments, with approximately one to one-and-a-half-mile sections of the roadway closed at a time
  • The speed limit will be reduced to 40 MPH from the posted 65 MPH speed outside of town