Colorado Highway 7 Lower (Lyons to Raymond)

Join us for a public meeting!

The project team will host a virtual public meeting to let people know the project is starting and explain the scope and schedule. Registration for the meeting is required at https://zoom.us/webinar/register/WN_0y20vQWKTZ6QRM3PoreyIg.

Wednesday, Feb. 10, 2021

6 p.m.

Via Zoom

Meeting Link: https://zoom.us/j/91426304000

Meeting call in option: (346) 248-7799

Meeting ID: 914 2630 4000

About the Project

In September 2013, flood waters saturated the mountainous terrain of Colorado Highway 7 (CO 7), causing numerous material slides, ditch damage and erosion to the roadway embankment. After eroding the highway embankment, the floods washed out the road in several places. Large amounts of debris, rock, and sediment were deposited in the creek and, as a result, redirected water flows – further contributing to the erosion of the channel banks and the undermining of the highway.

By November 2013, crews had completed extensive emergency repairs, including:

  • repairing full-width roadway losses;
  • repairing embankments;
  • removing sediment and debris;
  • replacing overtopped road sections
  • repairing shoulders;
  • regrading ditches; and
  • replacing damaged culverts.

Project Facts

  • Cost: TBD.
  • Contractor: Kiewit Infrastructure Co.
  • Timeline: Fall 2021
  • Location: Colorado Highway 7 between Lyons and Raymond.

Project Purpose - Permanent Repairs

The Colorado Highway 7 Project will provide longer-term improvements along Colorado Highway 7 between Lyons and Raymond. Pending funding availability, improvements may include: 

  • removing and replacing temporary asphalt placed during emergency repairs;
  • adding shoulders and rockfall ditches;
  • restoring ecological systems along the corridor;
  • re-establishing the creek channel while protecting its banks; and
  • establishing topsoil and vegetation in areas that were either damaged or disturbed by emergency repair work.

Timeline

Construction is expected to begin in Spring 2021, and local communities can expect public meetings in early 2021." and instead say Construction is expected to begin in Fall 2021. Local communities can expect public meetings in Spring 2021.


Major Project Updates 

The Colorado Highway 7 project team is currently working towards a project design that is 60% complete. Once the design is available, these plans will be reviewed by CDOT and the Contractor to: 

  • Provide construction cost estimates to CDOT to determine the project scope that fits within the current available budget
  • Evaluate potential construction sequencing to determine traffic control strategies and an overall project construction schedule 

The team is currently evaluating various traffic control plans. Each plan is being considered for cost, benefit, safety and public impact. Once more information is available, the project team will share detailed information with residents, business owners and all impacted stakeholders. 

Project coordination continues with local agencies, stakeholders and elected officials.  Please continue to check this page for updated information. 