CO 86 Resurfacing

About the Project

The work will include:

  • Mill and fill operations
    • Grinding down and recycling the top layer of asphalt
  • Place a new layer of fresh asphalt on top of the roadway

Work this Week & Lane Closures for CO 86 Resurfacing

Project Facts

  • Construction Cost: $1.4 million
  • Contractor: Brannan Sand and Gravel LLC
  • Timeline: June 2026 to August 2026
  • Location: CO 86 
    • Nearest Town/City: Elizabeth
    • Mile Point(s): MP 15.3 to MP 16.3
    • County: Elbert
Map of CO 86 Resurfacing project location from Mile Point 15.3 to MP 16.3
Map of CO 86 Resurfacing project location from Mile Point 15.3 to MP 16.3

Project Benefits

  • Prolong the life of the road surface
  • Provide a smoother road surface
  • Add durability by increasing the resistance of ruts and road damage
  • Smoother and safer drive for motorists

Work Schedule

To be announced.


Traffic Impacts

  • To be announced
  • Refer to COtrip.org for real-time travel conditions and road closures