The work will include:
- Mill and fill operations
- Grinding down and recycling the top layer of asphalt
- Place a new layer of fresh asphalt on top of the roadway
Work this Week & Lane Closures for CO 86 Resurfacing
Project Facts
- Construction Cost: $1.4 million
- Contractor: Brannan Sand and Gravel LLC
- Timeline: June 2026 to August 2026
- Location: CO 86
- Nearest Town/City: Elizabeth
- Mile Point(s): MP 15.3 to MP 16.3
- County: Elbert
Project Benefits
- Prolong the life of the road surface
- Provide a smoother road surface
- Add durability by increasing the resistance of ruts and road damage
- Smoother and safer drive for motorists
Work Schedule