CO 94 Eastern Plains Resurfacing

About the Project

Work will include:

  • A two-inch asphalt overlay
  • Rumble strip installation
  • Striping

Work this Week & Lane Closures for CO 94 Eastern Plains Resurfacing

Project Facts

  • Construction Cost: $12.3 million
  • Contractor: Martin Marietta
  • Timeline: July 2026 to December 2026
  • Location: CO 94 
    • Nearest Town/City: Rush and Aroya
    • Mile Point(s): MP 35 to MP 76
    • County: Lincoln
Map of project location on CO 94
Map of project location on CO 94, starting from Rush to Aroya.

Project Benefits

The new asphalt will provide the following benefits:

  • Add years of life to the highway
  • Provide a smoother road surface
  • Add durability by increasing the resistance of ruts and road damage

Work Schedule

  • Daytime work hours are one-half hour after sunrise and until one-half hour before sunset, Monday through Friday.

Traffic Impacts

Motorists can expect the following impacts during the period of construction:

  • One-lane alternating traffic
  • Up to 15-minute delays
  • 12-foot width restriction
  • Speed reduced to 35 MPH
  • Refer to COtrip.org for real-time travel conditions and road closures