I-70 EJMT Wall Panel Repair

About the Project:

Colorado Department of Transportation has contracted Ulteig Engineering to repair existing damage to wall panels in the length of the EJMT north tunnel. The project is meant to repair the shifted wall panels that have deteriorated over time due to excessive moisture and ice on the walls of the bore.

The Eisenhower Johnson Memorial Tunnel is over 50 years old needs of safety improvements. It is a major corridor for the State of Colorado for regional and national commerce, recreational traffic, and access to the mountain communities. This project will repair some of the critical items in the tunnel and improve conditions for the traveling public.  


Work Schedule

  • To be determined

Traffic Impacts

  • To be determined

Project Facts

  • Cost: $1 Million
  • Contractor: Ulteig Engineering
  • Timeline: July - October 2022
  • Location: I-70 Eisenhower-Johnson Memorial Tunnel, Clear Creek/Summit Counties