Facebook Pixel Image
Skip to content
Mobile CDOT Logo
  • Home
  • Travel
  • News
  • Safety
  • Performance
  • Business
  • Programs
  • Projects
  • About CDOT
  • A-Z A-Z
    • A
    • Annual Reports
    • K
    • KForms
CDOT Logo
Projects
You are here:
  1. Home
  2. Projects
  3. I-25 Interchange | Speer Boulevard & 23rd Avenue
  4. Related Projects & Studies
Resources
  • Public Involvement
  • I-25 Central PEL Report
  • Related Projects & Studies
  • Submit a Comment Frequently Asked Questions (FAQ)

Resources
  • Projects
  • Studies
  • Flood-Related Projects
  • FASTER
  • Central 70
  • Region 1 Denver Metro/Central Colorado Projects
  • Region 2 Southeastern Colorado Projects
  • Region 3 Northwestern Colorado Projects
  • Region 4 Northeastern Colorado Projects
  • Region 5 Southwestern Colorado Projects
  • CDOT Projects Overview
  • 2018 Public Meeting Presentation
  • ImprovementProjectLocations.jpg
  • cdot-travel-alerts.png
  • Assets
  • C470 - Wadsworth Boulevard to I-70 NEPA and Preliminary Design
  • I-25 (US 36 to 104th Ave) Improvements
  • CO 7 Lower (Lyons to Raymond)
  • Santa Fe PEL | C-470 to I-25
  • Southeastern Colorado Bridge Bundle Project
  • I-270 Corridor Improvements
  • Southeastern CO Centerline Rumble Strip Installation
  • Northeastern Colorado Bridge Rehabilitation in Boulder County
  • Teller County
  • El Paso County Bridge Maintenance
  • US 50 Bonforte to Avondale Resurfacing
  • About
  • Weld County ADA Ramps
  • US 285 Resurfacing between Monte Vista and Saguache
  • US 287 Concrete Panel Replacement LaPorte
  • US 50 La Junta Microsurfacing
  • CO 82 - Paepcke Transit Hub Improvements in the City of Aspen on Main and Galena
  • Park County Chain-Up Stations
  • Eisenhower-Johnson Memorial Tunnels Infrastructure Repairs
  • ITS Installation of Road Side Connected Vehicles
  • CO 133 Bowie Chip Seal
  • I-25 Interchange | Speer Boulevard & 23rd Avenue
    • Submit a Comment
    • Public Involvement
    • Related Projects & Studies
    • Meeting Documents
Related Projects & Studies https://www.codot.gov/projects/i25speerand23rd/related-projects-studies https://www.codot.gov/@@site-logo/siteLogo.png

Related Projects & Studies

  • Valley Highway EIS and ROD
  • Denver Moves: Enhanced Bikeways (2016)
  • Denver Moves: Pedestrians and Trails
  • Denver Moves Downtown
  • City and County of Denver Station Area Plans:
    • Broadway Station
    • Alameda Station
    • 10th and Osage Station
    • Decatur/Federal Station
  • City and County of Denver Strategic Transit-Oriented Development Plan
  • Downtown Area Plan
  • Denveright
  • Stadium District Master Plan
  • Sun Valley Eco-District
  • Neighborhood Planning Initiative
  • West Denver Renaissance Collaborative
  • River South Greenway Master Plan (PDF)
  • I-25 Central Planning and Environmental Linkages (PEL) Study
    • Attachment A: Existing Conditions Assessment Report
    • Attachment B: Alternatives Evaluation Technical Report
    • Attachment C: Traffic & Safety Technical Report
    • Attachment D: Agency & Public Coordination Summary
    • Attachment E: Federal Highway Administration PEL Questionnaire
    • Attachment F: Project Cost Estimate Assumptions
  • I-25 Central Planning and Environmental Linkages Corridor Conditions Report
    • I-25 Central PEL Existing Conditions Report - Appendix Part 1
    • I-25 Central PEL Existing Conditions Report - Appendix Part 2

Contact Us

Email: [email protected]
Phone: 720-515-3311

Please Note: We return your message within one business day.


Chris Enright
Project Manager
2829 W. Howard Pl.
Denver, CO 80204
[email protected]

Presley Fowler
Communications Specialist & Media Contact
[email protected]
303-990-0655

Stay Informed

CDOT Travel Alerts icon

Contact Us Contact Us Phone Icon 511 Icon
  • © 2022 State of Colorado
  • Accessibility
  • Privacy Statement
  • Security Statement
  • Transparency Online
Colorado Portal Logo