This project will remove the old asphalt pavement at the I-25 Exit 14 southbound ramp that leads to Trinidad and will replace it with a new concrete pavement ramp. It will also re-align the ramp for a straighter and safer exit.
Project Facts
- Construction Cost: $2.34 million
- Contractor: Concrete Works of Colorado
- Timeline: April 2026 to September 2026
- Location: Highway(s) and specific location
- Nearest Town/City: Trinidad
- Mile Point(s): MP 14.5
- County: Las Animas
Project Benefits
The current ramp has a sharp radius. The new ramp will re-align the southbound off-ramp for a safer exit. Benefits include:
- Aligns with natural steering behaviors
- Increases safety by reducing sudden, sharp turning movements
- Provides clearer sight distances and minimizes side forces
Work Schedule
To be announced.
Traffic Impacts
- To be announced