I-25 Exit 14 Trinidad Ramp Improvements

About the Project

This project will remove the old asphalt pavement at the I-25 Exit 14 southbound ramp that leads to Trinidad and will replace it with a new concrete pavement ramp. It will also re-align the ramp for a straighter and safer exit.

Project Facts

  • Construction Cost: $2.34 million
  • Contractor: Concrete Works of Colorado
  • Timeline: April 2026 to September 2026 
  • Location: Highway(s) and specific location 
    • Nearest Town/City: Trinidad
    • Mile Point(s): MP 14.5
    • County: Las Animas

Project Benefits

The current ramp has a sharp radius. The new ramp will re-align the southbound off-ramp for a safer exit. Benefits include:

  • Aligns with natural steering behaviors 
  • Increases safety by reducing sudden, sharp turning movements
  • Provides clearer sight distances and minimizes side forces

Work Schedule

To be announced.


Traffic Impacts

  • To be announced
  • Refer to COtrip.org for real-time travel conditions and road closures