I-70 & Pena Boulevard Drainage Improvements in Adams County

About the Project

The Colorado Department of Transportation (CDOT) and its contractor, Myers and Sons Construction, are improving drainage along I-70 to help manage stormwater and make the highway safer.

Work includes:

  • Cleaning out existing pipes and drains
  • Upgrading drainage structures
  • Adding new trench drains to help water flow more efficiently and reduce flooding
  • Removing built-up debris
  • Protecting inlets
  • Connecting new concrete pipes to the existing drainage system

Work this Week & Lane Closures for I-70 & Pena Boulevard Drainage Improvements

Project Facts

  • Construction Cost: $1 million
  • Contractor: Myers and Sons Construction
  • Timeline: October 2025 to December 2025
  • Location: I-70 and Pena Boulevard
    • Nearest Town/City: Aurora
    • Mile Point(s): MP 283 to MP 285
    • County: Adams

Project Benefits

  • Enhance driver safety by preventing hydroplaning, ice formation
  • Improve driver visibility
  • Extend roadway lifetime and durability by protecting pavement from water

Work Schedule

To be announced.


Traffic Impacts

  • To be announced
  • Refer to COtrip.org for real-time travel conditions and road closures