I-70 Watkins to Bennett Median Cable Barrier
About the Project
This project involves the installation and improvement of high-tension median cable barriers with concrete ditch paving on I-70 between the towns of Watkins and Bennett. Construction is expected to begin on Nov. 16, 2026 and, weather permitting, will be completed by March 16, 2027.
Project Facts
- Construction Cost: $3.48 million
- Contractor: Nationwide Construction
- Timeline: November 2026 to March 2027
- Location: Highway(s) and specific location
- Nearest Towns/Cities: Watkins and Bennett
- Mile Point(s): MP 293.90 to MP 307.72
- County: Adams and Arapahoe
Project Benefits
- Improving roadway safety
- Reduce crash severity
- Help prevent vehicles from crossing the median into oncoming traffic
- Reduce the potential for head-on collisions along this section of I-70
Work Schedule
- Tentative daily schedule for work will be 6 p.m. to 6 a.m. Monday through Friday and 7 a.m. to 6 p.m. on Saturdays
Traffic Impacts
Motorists can expect the following impacts during the period of construction:
- Left lane closures to allow construction trucks entering and exiting the closed left lanes
- Reduced speeds
- Lighting along the median to allow for night work
- Refer to COtrip.org for real-time travel conditions and road closures