I-76 Cable Rail Installation from Hudson to Keenesburg

About the Project

The Colorado Department of Transportation and its contracting partner, Coral Construction, will install new median cable barrier along Interstate 76 between Hudson and Keenesburg.

The new median cable barrier will provide an additional layer of safety for motorists traveling along this section of I-76. The steel cable system is designed to redirect vehicles that leave their lane and prevent them from crossing the median into oncoming traffic.

Work this Week & Lane Closures for I-76 Cable Rail Installation from Hudson to Keenesburg

Project Facts

  • Construction Cost: $2 million
  • Contractor: Coral Contractors
  • Timeline: Mid-October 2026 to November 2026
  • Location: I-76 
    • Nearest Towns/Cities: Hudson and Keenesburg
    • Mile Point(s): MP 32.97 to MP 38.9
    • County: Weld
I-76 Cable Rail Installation from Hudson to Keenesburg project location map.
Map for the I-76 Cable Rail Installation from Hudson to Keenesburg project with the starting location at Mile Point 32.9 and the ending location at MP 38.9.

Project Benefits

  • Reduce the severity of cross-median crashes
  • Help protect motorists traveling in both directions
  • Steel cable will absorb the crash energy in case a vehicle strikes
  • Prevents head-on collisions by redirecting traffic

Work Schedule

To be announced.


Traffic Impacts

  • To be announced