Lamar Traffic Signal Replacement
About the Project
A traffic signal replacement project will occur along US Highway 50 and US 287 in northwest Colorado. Traffic signal replacement work will occur on a two-mile stretch of highway from Maple Street to Savage Avenue, Mile Points 435.1 on US 50 to MP 76.5 on US 287.
The project will begin with pothole repairs and then will shut down to wait for material, and should resume in September.
Work this Week & Lane Closures for Lamar Traffic Signal Replacements
Project Facts
- Construction Cost: $1.74 million
- Contractor: Morton Electric, Inc.
- Timeline:
- Maintenance repairs in Summer 2025
- Construction in September to December 2025
- Location: US 50 & US 287
- Nearest Town/City: Lamar
- Mile Point(s): 76.5, 77.1 and 435.1
- County: Prowers

Project Benefits
- More information coming soon.
Work Schedule
- Work will last approximately four months
- Working hours are 7 a.m. to 5 p.m., Monday through Friday
Traffic Impacts
Motorists can expect the following impacts during the period of construction:
- Vehicles will be reduced to a single lane, alternating traffic intermittently in either direction throughout the duration of the project
- Refer to COtrip.org for real-time travel conditions and road closures