Southeastern Colorado Striping

About the Project

Crews will remove existing pavement markings and add new striping and markings. The project is expected to have a winter shutdown and work is anticipated to be complete in June 2026.

The project will take place in multiple counties, including:

  • El Paso
  • Huerfano
  • Las Animas 
  • Park
  • Pueblo
  • Summit
  • Teller

Crews will perform work on the following highways:

  • CO 9 between Fairplay and Breckenridge (Mile Point 64.91 to MP 80.3)
  • CO 12 from La Veta to Trinidad (MP 0 to 70.757)
  • CO 78 southwest of Pueblo (MP 31.79 to MP 33.27)
  • CO 94 east of Colorado Springs (MP 0.548 to MP 17.10)
  • CO 96 Pueblo (MP 50.303 to MP 58.812)
  • CO 105 Monument (MP 4.731 to 6)
  • CO 115 south of Colorado Springs (MP 38.952 to MP 41.957)
  • I-25 between Larkspur and Trinidad (MP 26.6 to MP 164)
  • US 24 between Buena Vista and Colorado Springs (MP 225.57 to MP 303.43
  • US 285 from Fairplay south (MP 161.79 to MP 182.5)
  • US 50 from the intersection at I-25 in Pueblo to Pueblo West (MP 209.267 to MP 314.598)

Work this Week & Lane Closure for Southeastern Colorado Striping

Project Facts

  • Construction Cost: $3.5 million
  • Contractor: Road Safe Traffic
  • Timeline: August 2025 to June 2026
  • Locations: CO 9, CO 12, CO 78, CO 94, CO 96, CO 105, CO 115, I-25, US 24, US 285 and US 50
    • Nearest Towns/Cities: Fairplay, Colorado Springs and Pueblo
    • Mile Point(s): MP 266 to MP 164 (refer to the About the Project for specifics)
    • Counties: El Paso, Huerfano, Las Animas, Park, Pueblo, Summit and Teller

Project Locations


Map of pavement marking project locations from Colorado Springs to Fairplay
Map of pavement marking project locations on I-25 from Monument to Colorado Springs, US 24 from Colorado Springs to Fairplay, CO 94 and CO 115
Map of pavement marking project locations along Walsenburg
Map of pavement marking project locations on I-25 from Walsenburg to Ludlow and CO 12 from Trinidad to Cuchara
Map of pavement marking project locations in Pueblo
Map of pavement marking project locations in Pueblo: I-25, US 50, CO 94 and CO 78

Project Benefits

The pavement striping and markings will make traveling conditions safer providing brighter, more visible lines.


Work Schedule

  • Crews will start at the CO 9, US 285 and US 24 locations
  • In September 2025, crews will work on the following locations:
    • Colorado Springs (US 94 and CO 115)
    • Pueblo (US 50, CO 96 and CO 78)
  • Sunday through Thursday nights, work will take place from 7 p.m. to 7 a.m.

Traffic Impacts

Motorists can expect the following impacts during the period of construction:

  • Various mobile lane closures will take place within the work zones with reduced speeds
  • Plan ahead and expect short delays
  • This is a swift moving, mobile operation; although work zones will only be in place for a few hours, motorists are urged to use caution and watch for heavy equipment
  • Through lanes and turn lanes may be temporarily closed to traffic causing brief travel delays
  • Travelers are discouraged from passing the striping truck and crossing over fresh paint, as this may damage a vehicle’s finish. Please drive with patience during striping operations
  • Construction schedules could change depending on the weather
  • Refer to COtrip.org for real-time travel conditions and road closures