Facebook Pixel Image
Skip to content
Mobile CDOT Logo
  • Home
  • Travel
  • News
  • Safety
  • Performance
  • Business
  • Programs
  • Projects
  • About CDOT
  • A-Z A-Z
    • A
    • Annual Reports
    • K
    • KForms
CDOT Logo
Projects
You are here:
  1. Home
  2. Projects
  3. Studies
  4. I-25 Through Pueblo - New Pueblo Freeway EIS and ROD
  5. Documents
Resources
  • Projects
  • Studies
    • US 24 West Finding of No Significant Impact (FONSI)
    • North I-25 PEL Study, US 36 to CO 7
    • US 34 & US 85 Interchange PEL Study
    • I-25 and Arapahoe Road/SH 88 Interchange Environmental Assessment & FONSI
    • I-25 Colorado Springs Area Finding of No Significant Impact (FONSI)
    • CO 7 Cherryvale to 75th Street EA & FONSI
    • US 34, US 287 to Larimer County Rd. 3 EA and FONSI
    • US 36 Managed Lanes - Investment Grade Traffic and Revenue Study
    • South I-25 Corridor and US 85 Corridor FEIS & ROD
    • US 6 - 24 Road to SH 139 Access Control Plan
    • US 6/River Front Road Access Control Plan in Silt
    • 2009 Disparity Study and Appendices
    • I-25 Valley Highway Environmental Impact Statement (EIS) and ROD
    • I-25, Colorado Springs to Monument Environmental Assessment
    • SH 42 Planning and Environmental Linkage Study (PEL)
    • US 40 Section 4(f) Evaluation
    • US 50 West Wills Blvd to McCulloch Blvd EA
    • US 50 West PEL Study
    • SH 60 Access Control Plan
    • SH 60 Environmental Overview Study
    • I-70/32nd Avenue Interchange Environmental Assessment
    • I-70 Mountain Corridor Mobility and Operational Assessment
    • I-70 Mountain Corridor Short Term Mobility Solutions Report
    • I-70 Reversible Lane Study
    • I-70 Reversible (Zipper) Lane Study Phase II
    • I-70 Twin Tunnels Environmental Assessment
    • SH 88/Federal Boulevard Environmental Assessment and FONSI
    • SH 133 Carbondale Access Control Plan
    • US 160 Durango to Bayfield Final EIS
    • US 160 Durango to Bayfield ROD October 2006
    • US 285 Environmental Assessment with Appendices
    • US 287 at Lamar Environmental Assessment and FONSI
    • US 287 Loveland to Fort Collins Environmental Overview Study (EOS)
    • US 287 from CO 1 to the LaPorte Bypass EA and FONSI
    • US 385 High Plains Corridor
    • SH 402 EA and FONSI
    • C-470 Environmental Assessment & FONSI 2015
    • Denver Area Regional Bus Facility Study
    • Devolution Study Report
    • Eastern Colorado Mobility Study
    • Northwest Corridor EIS
    • Ports to Plains
    • Region 3 Intersection Priority
    • Studies & Assessments
    • I-25 Through Pueblo - New Pueblo Freeway EIS and ROD
      • Draft Environmental Impact Statement (DEIS)
      • Final Environmental Impact Statement (FEIS)
      • Phase 1 Record of Decision
      • I-25 Bridges Over Ilex and UPRR Design Build
      • Documents
        • Chapter00_Cover_Availability_TOC_Acronym_List.pdf
        • Chapter01_Introduction.pdf
        • Chapter02_Identification_of_the_Preferred_Alternative.pdf
        • Chapter03_Phase_1_of_the_Preferred_Alternative.pdf
        • Chapter04_Section_4f.pdf
        • Chapter05_Clarifications_to_the_FEIS_and_Updates_in_Regulations.pdf
        • Chapter06_Public_Comments_Received_on_the_FEIS.pdf
        • Chapter07_Federal_State_and_Local_Permits_and_Approvals.pdf
        • Chapter08_Mitigation.pdf
        • Chapter09_Record_of_Decision.pdf
        • Chapter10_References.pdf
        • Combined_ROD_MainText_April2014.pdf
        • Combined_Appendix_A-F.pdf
        • Appendix_F_I-25_Bridge_Over_the_Arkansas_River.pdf
        • Appendix_E_Section_106_Programmatic_Agreement.pdf
        • Appendix_D_Agency_Correspondence.pdf
        • Appendix_C_Public_Involvement_Materials.pdf
        • Appendix_B_Response_to_Public_and_Agency_Comments_on_the_FEIS.pdf
        • Appendix_A_Figures_of_Preferred_Alternative_and_Phase_1.pdf
  • Flood-Related Projects
  • FASTER
  • Central 70
  • Region 1 Denver Metro/Central Colorado Projects
  • Region 2 Southeastern Colorado Projects
  • Region 3 Northwestern Colorado Projects
  • Region 4 Northeastern Colorado Projects
  • Region 5 Southwestern Colorado Projects
  • CDOT Projects Overview
  • 2018 Public Meeting Presentation
  • ImprovementProjectLocations.jpg
  • cdot-travel-alerts.png
  • Assets
  • C470 - Wadsworth Boulevard to I-70 NEPA and Preliminary Design
  • I-25 (US 36 to 104th Ave) Improvements
  • CO 7 Lower (Lyons to Raymond)
  • Santa Fe PEL | C-470 to I-25
  • Southeastern Colorado Bridge Bundle Project
  • I-270 Corridor Improvements
  • Southeastern CO Centerline Rumble Strip Installation
  • Northeastern Colorado Bridge Rehabilitation in Boulder County
  • Teller County
  • El Paso County Bridge Maintenance
  • US 50 Bonforte to Avondale Resurfacing
  • About
  • Weld County ADA Ramps
  • US 285 Resurfacing between Monte Vista and Saguache
  • US 287 Concrete Panel Replacement LaPorte
  • US 50 La Junta Microsurfacing
  • CO 82 - Paepcke Transit Hub Improvements in the City of Aspen on Main and Galena
  • Park County Chain-Up Stations
  • Eisenhower-Johnson Memorial Tunnels Infrastructure Repairs
  • ITS Installation of Road Side Connected Vehicles
  • CO 133 Bowie Chip Seal
Documents https://www.codot.gov/projects/studies/i25puebloeis/documents https://www.codot.gov/@@site-logo/siteLogo.png

Documents

Title Type
Chapter00_Cover_Availability_TOC_Acronym_List.pdf File
Chapter01_Introduction.pdf File
Chapter02_Identification_of_the_Preferred_Alternative.pdf File
Chapter03_Phase_1_of_the_Preferred_Alternative.pdf File
Chapter04_Section_4f.pdf File
Chapter05_Clarifications_to_the_FEIS_and_Updates_in_Regulations.pdf File
Chapter06_Public_Comments_Received_on_the_FEIS.pdf File
Chapter07_Federal_State_and_Local_Permits_and_Approvals.pdf File
Chapter08_Mitigation.pdf File
Chapter09_Record_of_Decision.pdf File
Chapter10_References.pdf File
Combined_ROD_MainText_April2014.pdf File
Combined_Appendix_A-F.pdf File
Appendix_F_I-25_Bridge_Over_the_Arkansas_River.pdf File
Appendix_E_Section_106_Programmatic_Agreement.pdf File
Appendix_D_Agency_Correspondence.pdf File
Appendix_C_Public_Involvement_Materials.pdf File
Appendix_B_Response_to_Public_and_Agency_Comments_on_the_FEIS.pdf File
Appendix_A_Figures_of_Preferred_Alternative_and_Phase_1.pdf File

Contact Us Contact Us Phone Icon 511 Icon
  • © 2022 State of Colorado
  • Accessibility
  • Privacy Statement
  • Security Statement
  • Transparency Online
Colorado Portal Logo