Facebook Pixel Image
Skip to content
Mobile CDOT Logo
  • Home
  • Travel
  • News
  • Safety
  • Performance
  • Business
  • Programs
  • Projects
  • About CDOT
  • A-Z A-Z
    • A
    • Annual Reports
    • K
    • KForms
CDOT Logo
Projects
You are here:
  1. Home
  2. Projects
  3. Studies
  4. Completed Studies
  5. US 6 Clifton Transportation Study
  6. Public Participation
  7. Public Meeting #2
  8. Graphic Displays
Graphic Displays https://www.codot.gov/projects/studies/study-archives/us6cliftonstudy/public-participation/public-meeting-2/graphic-displays https://www.codot.gov/@@site-logo/siteLogo.png

Graphic Displays

Title Type
01 Study Area File
02 Purpose and Need and Project Secondary Goals File
03 PEL Study Process File
04 Alternatives Screening Process File
05 Study Schedule File
06 Existing and Future Traffic Operations File
07 Level of Service Descriptions File
08 Multimodal Conditions File
09 Five Year Crash Summary File
10 Level 1 Alternatives File
11 Level 1 Screening Matrix File
12 Level 2 Alternatives File
13 Level 2 Screening Matrix File
14 Level 3 Alternative 1 2 Lane with Traffic Signals File
15 Level 3 Alternative 1 2 Lane with Roundabout File
16 Level 3 Alternative 1 33 Road Roundabout Option File
17 Level 3 Alternative 3 4 Lane File
18 Level 3 Alternative 16 Front Street File
19 Level 3 Screening Matrix (1) File
20 Recommended Improvements File
21 Project Process File

Tags:
  • Project: US 6 Clifton Study
Need More Help?

Sign Up for Travel Alerts & News

CDOT Travel Alerts icon

Contact Us Contact Us Phone Icon 511 Icon
  • © 2022 State of Colorado
  • Accessibility
  • Privacy Statement
  • Security Statement
  • Transparency Online
Colorado Portal Logo