US 24 Access Control Plan from Elbert Road to County Line Study

About the Study

The Colorado Department of Transportation is developing an Access Control Plan (ACP) for 25 miles of US 24 in eastern El Paso County, from Elbert Road west of Peyton to the El Paso-Elbert county line east of Ramah. The plan will guide future access decisions along the corridor.

ACPs protect public safety and keep traffic moving by guiding the location and design of driveways and intersections serving homes, businesses and future development. Recommendations for private properties would be implemented upon redevelopment. One access per property will be maintained where no alternative access exists.

The 2018 US 24 Planning and Environmental Linkages study recommended an ACP. That study identified corridor roadway and intersection improvements to improve safety and traffic flow on US 24 and intersecting roads, leaving individual property access recommendations to an ACP. The ACP is expected to be finalized by late 2027.

Project Area

A simple road ramp showing the US 24 Access Control Plan limits from Elbert Road east of Peyton to the El Paso County line west of Ramah, along US Highway 24.
US 24 Access Control Plan, Elbert Road to County Line Map

Schedule & Important Dates

  • November & December 2026: Data collection, traffic and safety analysis
  • Early 2027: Develop preliminary access control recommendations
  • Early 2027: Coordination with impacted properties and agencies
  • March/April 2027: Public open house and draft recommendation comment period
  • Spring 2027: Draft Access Control Plan
  • Summer 2027: Agency reviews and plan adoption

Collaboratively develop a plan to improve safety and preserve traffic flow on US 24 while providing adequate access to homes, businesses and future development.

Benefits of the Access Control Plan:

  • Safer travel: Appropriately spaced access points reduce places where vehicles cross, merge or turn, reducing crashes and conflicts with people walking and biking
  • Smoother traffic flow: Reducing access points reduces interruptions and delays as traffic volumes grow, making travel times more reliable
  • Protection of taxpayer investments: Preserving the ability for the US 24 highway to carry traffic protects the investment in the existing roadway
  • Coordinated growth: A shared plan will guide CDOT, El Paso County, Calhan and Ramah to make consistent decisions about property access as land develops or redevelops