Facebook Pixel Image
Skip to content
Mobile CDOT Logo
  • Home
  • Travel
  • News
  • Safety
  • Performance
  • Business
  • Programs
  • Projects
  • About CDOT
  • A-Z A-Z
    • A
    • Annual Reports
    • K
    • KForms
CDOT Logo
Projects
You are here:
  1. Home
  2. Projects
  3. Studies
  4. WestConnect Coalition PEL Study
  5. Final Reports
Quick Links
  • Study Area
  • Study Schedule
  • Public & Agency Participation 
    • Public & Agency Participation
    • Public Meeting Round 1 Materials
    • Public Meeting Round 2 Materials
    • Telephone Town Hall No. 2 Materials
  • FAQ
  • Final Reports
Final Reports https://www.codot.gov/projects/studies/westconnect-coalition-pel-study/final-reports https://www.codot.gov/@@site-logo/siteLogo.png

Final Reports

Final Reports

WestConnect Final Report
  • Final Corridor Conditions Report (April 2017)
    • Final Corridor Conditions Report Appendix (April 2017)

  • Final Environmental Scan Report (April 2017)
    • Download a reduced-file-size version of this report.

  • Final Alternatives Report (January 2018)

  • Final PEL Study Report (May 2018)


Contact Us Contact Us Phone Icon 511 Icon
  • © 2022 State of Colorado
  • Accessibility
  • Privacy Statement
  • Security Statement
  • Transparency Online
Colorado Portal Logo