US 160 Resurfacing Durango to Elmore's Corner
About the Project
Work will include:
- Highway resurfacing
- New striping and delineators
- Guardrails and road signs replacement
- New ramps installation, compliant with the Americans with Disabilities Act at the following US 160 intersections:
- CO 172/CR 234 (Elmore’s Corner)
- Dominguez Drive
- River Road
- Three Springs Boulevard
Additional work will include:
- Drainage and inlet repairs at the concrete median from south of Home Depot to old Farmington Hill
- Settlement repairs and resurfacing on the exit ramps at Grandview Interchange
Work this Week & Lane Closures for US 160 Resurfacing from Durango to Elmore's Corner
Project Facts
- Construction Cost: $11.2 million
- Contractor: Elam Construction
- Timeline: March 2026 to November 2026
- Location: US 160
- Nearest Town/City: Durango
- Mile Point(s): MP 86 to MP 92
- County: La Plata
Project Benefits
The new asphalt will provide the following benefits:
- Adds years of life to the highway
- Provides a smoother road surface
- Adds durability by increasing the resistance of ruts and road damage
- The new guardrail will be 31 inches high
- Designed to meet new safety standard requirements
- Higher railing will help veering vehicles remain on the road more effectively
- Safer highway for the traveling public
In addition, the ADA compliant curb ramps provides functional accessibility for multi-modal users.
Work Schedule
- Nighttime work hours are Sunday night through Friday morning from 7 p.m. to 7 a.m.
Traffic Impacts
- Single lane closures with lane shifts and shoulder closures
- 15-minute delays
- A speed reduction to 45 MPH
- Lane closures and traffic shifts will remain in place 24/7
- Expect daytime delays and congestion
- Most work will occur at night
- Refer to COtrip.org for real-time travel conditions and road closures