US 24 Resurfacing from Peyton to Calhan
About the Project
Resurfacing work will include:
- Minor culvert work
- Replacing curb and gutter
- Constructing a passing lane east of Calhan
- Widening a right-turn lane at Yoder Street to improve safety
Project Facts
- Construction Cost: $11.3 million
- Contractor: Schmidt Construction CO
- Timeline: April 2026 to September 2026
- Location: US 24
- Nearest Town/City: Calhan
- Mile Point(s): MP 332 to MP 342.5
- County: El Paso
Project Benefits
This project will provide important benefits for the traveling public, including:
- A smooth road or highway
- Improved safety
- Better driving experience
Work Schedule
To be announced.
Traffic Impacts
- To be announced
- Refer to COtrip.org for real-time travel conditions and road closures