The Colorado Department of Transportation in cooperation with Sturgeon Electric, will be installing new traffic signals on US 24 at the Stapleton Road and Academy Park Loop intersections. Additional fiber optic installations will take place between Judge Orr Road and Stapleton Road. Curb ramp upgrades to meet Americans with Disabilities Act (ADA) standards and trail connections are also included in the project's scope.
Work this Week & Lane Closures for US 24 Traffic Signal Installations
Project Facts
- Construction Cost: $1.89 million
- Contractor: Sturgeon Electric
- Timeline: August 2026 to February 2027
- Location: US 24
- Nearest Towns/Cities: Colorado Springs and Falcon
- Mile Point(s): MP 306.9 to MP 323.75
- County: El Paso
Project Benefits
- Traffic studies performed at both intersections indicated that signal installations would improve the safety of the traveling public better assist the flow of travel in each direction
- Fiber optic installations will help deliver reliable wifi needed for businesses, schools and other critical infrastructure in the growing area
- ADA ramp upgrades and trail connections will help offer safe and reliable transportation options for multimodal users
Work Schedule
- The project started initial utility potholing in September and will return in November to start underground utility work, ADA ramp upgrades and fiber optic installations.
- New traffic signals will be installed in Feb. 2027, along with final striping and signage installations.
- The project is expected to be complete by April 2027.
- General working hours will be from 7 a.m. to 3 p.m., Monday through Friday.
- Some nighttime work is expected in 2027 to install signal mast arms.
Traffic Impacts
Motorists can expect the following impacts during the period of construction:
- Motorists can expect single-lane closures and turn-pocket closures at both the Academy Park Loop and Stapleton Road intersection locations
- Lane closures will be implemented during off-peak travel times from 9 a.m. to 3 p.m.
- At least one through-lane of travel will remain open at all times
- Pedestrians can expect some sidewalk and crosswalk closures with detour routes at the Academy Park Loop intersection. Please follow all on-site signage to navigate around active work areas
- Bus routes will remain unaffected by the project
- The project team does not anticipate significant delays due to construction
- Motorists are encouraged to account for up to 10 minutes of extra travel time
- Speeds will be reduced to 45 mph at the Stapleton Road work zone