US 285 Bridge Improvements in Conejos County
About the Project
The project will take place in Conejos County on US 285, approximately one mile north of Antonito (Mile Point 7 to 8).
This project includes:
- Resurfacing a bridge deck at MP 7.59
- Replacing the bridge structure at MP 7.82
Traffic on US 285 will be detoured around the northern bridge on a one-lane temporary road.
Project Facts
- Construction Cost: $2.8 million
- Contractor: WW Clyde
- Timeline: November 2025 to May 2026
- Location: US 285
- Nearest Town/City: Antonito
- Mile Point(s): MP 7 to MP 8
- County: Conejos
Project Benefits
This project will benefit the public by making the bridges safer and more reliable for users.
Work Schedule
To be announced.
Traffic Impacts
- Refer to COtrip.org for real-time travel conditions and road closures