US 287 Intersection Improvements in Broomfield County
About the Project
This project aims to enhance safety and optimize traffic flow across four intersections on US 287.
The primary scope of work includes:
- Widening lanes
- Adding turn lanes
- Improving lane configurations at the intersections to improve capacity and traffic flow
Other work includes:
- Installing medians
- Adding pedestrian crosswalks
- Installing new signal heads at two of the four intersections to accommodate the new lanes
Improvements at US 287 & Miramonte Boulevard: At this intersection, crews will extend the existing southbound left turn lane on US 287 to eastbound Miramonte Boulevard by 200 feet by removing the median (without roadway widening). The left turn lane on westbound Miramonte Boulevard onto southbound US 287 will be extended to the first driveway entrance on the east side of US 287.
Improvements at US 287 & Midway Boulevard: Improvements at this intersection include adding a second southbound left turn lane on US 287 at Midway Boulevard; improving the east leg of Midway Boulevard to receive two left turn lanes; modifying the northbound US 287 right turn lane to eastbound Midway Boulevard; and making pedestrian crossing, signage, striping, and safety improvements.
Improvements at US 287/CO 121 & US 36 Junction: Improvements at this intersection include shifting the southbound US 287 lanes at the westbound US 36 ramp junction into the median, adding a raised median between the southbound through lanes and southbound on-ramp lane, and making associated signing, striping and signal modifications.
Improvements at US 287/W. 120th Avenue & Sheridan: Work includes converting the existing eastbound right turn lane into a through lane/right turn choice lane by restriping and making lane width adjustments. On the opposite side of the intersection, each through lane will have a traffic signal head centered over the lane.
Project Facts
- Construction Cost: $1.95 million
- Contractor: Villalobos Concrete, Inc.
- Timeline: September 2026 to December 2026
- Location: Highway(s) and specific location
- Nearest Town/City: Broomfield
- Mile Point(s): MP 296.119 to MP 299.356
- County: Broomfield
Project Benefits
- Improve mobility and increase traffic capacity by providing additional turn lanes
- Enhance safety and accessibility through new pedestrian sidewalks
- Optimize traffic flow by installing new signal heads
Work Schedule
- Work is set to begin Sept. 1, with anticipated completion by December 2026.
- Working hours will be split between daytime (7 a.m. to 7 p.m. Monday to Friday) and overnight shifts (7 p.m. to 6 a.m. Sunday to Thursday)
- Actual working hours may vary. Some weekend work is also expected
Traffic Impacts
Motorists can expect the following traffic impacts during construction:
- US 287 Northbound (CO 121 to Miramonte Blvd): Single lane closures from 6 p.m. to 6 a.m. weekdays and 7 p.m. to 10 a.m. weekends
- US 287 Southbound (Miramonte Blvd to CO 121): Single lane closures from 10 a.m. to 1 p.m. and 7 p.m. to 6 a.m. weekdays, and 7 p.m. to 10 a.m. on weekends
- US 287 Eastbound (West 120th Avenue & Sheridan Boulevard): Single lane closures from 9 a.m. to 3 p.m. and 6 p.m. to 6 a.m. weekdays, and anytime on weekends
- CO 121 Northbound at US 36: Single lane closures from 9 a.m. to noon and 7 p.m. to 6 a.m. on weekdays, and from 8 p.m. to 10 a.m. on weekends
- CO 121 Southbound at US 36: Single lane closures from 10 a.m. to noon and 6 p.m. to 6 a.m. weekdays, and from 8 p.m. to 10 a.m. on weekend
- Full access to roadways, area businesses, sidewalks and driveways will be maintained
- Refer to COtrip.org for real-time travel conditions and road closures