US 350 Resurfacing in Otero County

About the Project

The Colorado Department of Transportation and its contracting partner, Bettis Asphalt & Construction, will begin a roadway resurfacing project on US Highway 350 between County Road 9 and CR 24, southwest of La Junta. Construction is anticipated to begin in late March 2026, with completion expected in December 2026.

Work includes:

  • Milling
  • Resurfacing the roadway with hot mix asphalt

Additional improvements include:

  • Installing riprap, a protective layer of stones to prevent erosion
  • Installing rumble strips
  • Replacing outdated signage and delineator
  • Applying new pavement striping and markings

Work this Week & Lane Closures for US 350 Resurfacing in Otero County

Project Facts

  • Construction Cost: $10 million
  • Contractor: Bettis Asphalt
  • Timeline: March 2026 to May 2026
  • Location: US 350 
    • Nearest Town/City: La Junta
    • Mile Point(s): MP 45.7 to MP 64.7
    • County: Otero
Map of the US 350 Resurfacing Project limits in Otero County, from MP 45.7 to MP 64.7
Map of the US 350 Resurfacing Project limits in Otero County, from MP 45.7 to MP 64.7

Project Benefits

  • Provide a smoother driving surface
  • Enhance overall safety for motorists
  • Extend the life of the pavement
  • Reduce long-term maintenance needs and costs
  • Improve visibility and erosion control
  • Provide clearer guidance for motorists traveling through the corridor

Work Schedule

To be announced.


Traffic Impacts

During construction, motorists can anticipate:

  • Alternating single-lane closures with traffic directed by flaggers
  • Possible delays
  • Refer to COtrip.org for real-time travel conditions and road closures