US 40 Milner Resurfacing

About the Project

This project will resurface a 14-mile stretch of US Highway 40 through Milner. Paving work will take place from Mile Points 112 to MP 126.

Additional work includes:

  • Guardrail replacement
  • Minor improvements
  • Safety enhancements on three bridges
  • Slope stabilization

Work this Week & Lane Closures for US 40 Milner Resurfacing

Project Facts

  • Construction Cost: $12 million
  • Contractor: United Companies
  • Timeline: April 2026 to October 2026
  • Location: US 40 
    • Nearest Town/City: Milner
    • Mile Point(s): MP 112 to MP 126
    • County: Routt

Project Benefits

This highly traveled commuter corridor between Craig and Steamboat Springs will see benefits including:

  • Improved driving surfaces
  • Slope stabilization in the notoriously challenging rockfall location of Mount Harris Canyon

Work Schedule

To be announced.


Traffic Impacts

  • To be announced
  • Refer to COtrip.org for real-time travel conditions and road closures