US 40 Milner Resurfacing
About the Project
This project will resurface a 14-mile stretch of US Highway 40 through Milner. Paving work will take place from Mile Points 112 to MP 126.
Additional work includes:
- Guardrail replacement
- Minor improvements
- Safety enhancements on three bridges
- Slope stabilization
Work this Week & Lane Closures for US 40 Milner Resurfacing
Project Facts
- Construction Cost: $12 million
- Contractor: United Companies
- Timeline: April 2026 to October 2026
- Location: US 40
- Nearest Town/City: Milner
- Mile Point(s): MP 112 to MP 126
- County: Routt
Project Benefits
This highly traveled commuter corridor between Craig and Steamboat Springs will see benefits including:
- Improved driving surfaces
- Slope stabilization in the notoriously challenging rockfall location of Mount Harris Canyon
Work Schedule
To be announced.
Traffic Impacts
- To be announced