US 40 Over Shelton Ditch Bridge Replacement
About the Project
The work will include removing the existing timber bridge and replacing it with a highway rated bridge structure. There will be the installation of a concrete box culvert at Shelton Ditch. A temporary detour will be built to detour traffic while the new bridge is being built.
Work will also include:
- Water control and diverging the ditch while construction is taking place
- Guardrail replacement
- Paving of the new bridge structure
Work this Week & Lane Closures for US 40 Over Shelton Ditch Bridge Replacement
Project Facts
- Construction Cost: $2.4 million
- Contractor: United Companies
- Timeline: April 2026 to October 2026
- Location: US 40
- Nearest Town/City: Hayden
- Mile Point(s): MP 107.5 to MP 109
- County: Routt
Project Benefits
- The new bridge structure is designed to be a full-size, highway-rated structure
- Support commercial vehicle loads
- Accommodate traffic that often utilizes this stretch of US 40 to commute between Craig and Steamboat Springs
- Improved driving surface
Work Schedule
To be announced.
Traffic Impacts
- To be announced
- Refer to COtrip.org for real-time travel conditions and road closures