US 50 Culverts Repairs in Cañon City

About the Project

A culvert repair project will take place along US 50 in northwest Colorado. Work will take place just east of downtown in Cañon City on a two-mile stretch of highway from 15th Street to Justice Center Road, Mile Points 279.33 to 281.65. The work will include the relining of 34 culverts along a two-mile stretch of US 50, utilizing the Pipe Rehabilitation by Ultraviolet (UV) Light Glass Reinforced Cured-In-Place Pipe (CIPP) process.

Work this Week & Lane Closures for US 50 Culvert Repair in Cañon City

Project Facts

  • Construction Cost: $1.45 million
  • Contractor: Instituform Technologies, LLC
  • Timeline: December 2025 to March 2026
  • Location: US 50 
    • Nearest Town/City: Cañon City
    • Mile Point(s): MP 279.33 to MP 281.65
    • County: Fremont
Project map for the US 50 Culvert Repair in Cañon City from MP 279.33 to 281.65
Project map for the US 50 Culvert Repair in Cañon City from MP 279.33 to 281.65

Project Benefits

  • Accommodate higher accumulations of rainfall
  • Lower the risks associated with such instances as flooding
  • Maintain safe driving conditions

Work Schedule

To be announced.


Traffic Impacts

  • To be announced
  • Refer to COtrip.org for real-time travel conditions and road closures