Wadsworth Boulevard & Evans Avenue Intersection Improvements

About the Project

Work includes:

  • Installation of new traffic signal and curb ramps at the intersection of Wadsworth Boulevard and Evans Avenue
  • One dual mast arm, and two single mast arms
  • New pedestrian crossing infrastructure for the north and east legs of the intersection
  • Median work on Wadsworth Boulevard to channelize the signalized turning movements
  • Signing and striping
  • New concrete bus pad on Northwest corner of intersection

Project Facts

  • Construction Cost: $655,850
  • Contractor: Lighthouse Transportation, LLC
  • Timeline: November 2025 to December 2025
  • Location: CO 121 
    • Nearest Town/City: Lakewood
    • Mile Point(s): MP 9.3 to MP 9.37
    • County: Jefferson

Project Benefits

  • Improve traffic flow for motorists and enhance pedestrian safety at crosswalks
  • New infrastructure and a cleaner look for the city

Work Schedule

To be announced.


Traffic Impacts

  • To be announced
  • Refer to COtrip.org for real-time travel conditions and road closures