Western Colorado Roundabout Striping
About the Project
Work shall consist of:
- Removal of existing markings
- Supply and application of epoxy pavement marking
- Installation of preformed thermoplastic words and symbols, and crosswalk stencils
The project takes place at all roundabouts on state highways within western Colorado, including:
- CO 133A
- CO 340A
- CO 82A
- CO 9C
- I-70A ramps
- I-70 F
- I-70 G
- US 6D
- US 6E
All pavement markings and stencils shall be ground to create a recessed groove
Project Facts
- Construction Cost: $288,898.50
- Contractor: RoadSafe Traffic
- Timeline: April 2026 to June 2026
- Location: CO 133, CO 340, CO 82, CO 9, I-70, US 6
- Nearest Towns/Cities: Grand Junction, Fruita, Silt, Rifle, Glenwood, Carbondale, Aspen, Eagle, Edwards, Avon, Vail and Breckenridge
- Mile Point(s): MP 27.5 to MP 31.4
- Counties: Mesa, Garfield, Pitkin, Eagle and Summit
Project Benefits
This project will benefit the public by making the markings on roundabouts more visible which will increase the safety.
Work Schedule
To be announced.
Traffic Impacts
- To be announced
- Refer to COtrip.org for real-time travel conditions and road closures