Letting Date |
Project Description |
Low Bidder |
Bid Tabulation |
Jan 14 |
STR 109A-020 (23189) ~ The project is located in Region 2 in several counties. The overall project area is from MP 0 (SH 160) to MP 31 (Bent County line) on SH 109. The main area of work consists of the entirely of SH 109 with a 1 inch asphalt leveling course with a 1.5 inch asphalt overlay. Included are areas requiring rebuild treatment of 6 inches asphalt over 6-inches aggregate base course. Safety improvements will include upgrading guardrail to meet new 31 inch standards, along SH 109. |
A&S Construction Co. |
Pending |
Jan 14 |
NHPP 0361-124 (22796) ~The project is located in Region 1 in Boulder county. Project includes resurfacing approximately 2.6 miles. Bridge work including expansion device replacement and class 2 and 3 repair. Type 3 guardrail upgrades at various locations along the corridor/ramps. |
Martin Marietta Materials, Inc. |
Pending |
Jan 14 |
STA 0404-056 (20821) ~ The project is located in Region 1 in Arapahoe county. The project included resurfacing and drainage, signing, striping, and curb and cutter. |
Brannan Sand & Gravel, LLC |
Pending |
Jan 14 |
FBR 0243-091 (22995) ~ The project is located in Region 2 in El Paso county. Work includes replacing str. H-19-C with double 8' x 8' CBC box, extending 4' x 8' CBC Box, drainage work, embankment, HMA, and Riprap. |
TEZAK Heavy Equipment Co. Inc. |
Pending |
Jan 14 |
C 2911-003 (22859) ~ The project is located in Region 5 in Chaffee county. The work consists of construction or reconstruction of ADA curb ramps and sidewalk at various locations along US 50 & SH 291 in Salida. |
Western Gravel Constructors, LLC |
Pending |
Jan 7 |
STR 0505-049 (21776) ~ The project is located in Region 2 in Bent and Otero counties. The work on this project will consist of roadway resurfacing, roadway widening for passing lanes, guardrail replacement, sign replacement, roadway patching, and RCP culvert installation. |
A&S Construction Co. |
Pending |
Jan 7 |
NHPP 0362-038 (21851) ~ The project is located in Region 4 in Washington county. The project consists of plaining the existing asphalt mat approximately 1 inch in depth and overlay of 2 ½ inches of ho mix asphalt. The project will include shouldering material with rumble strips and permanent pavement markings. |
Simon Constractors |
Pending |
Jan 7 |
CR 400-375 (23062) ~The project is located in Region 4 in several counties. This project consists of ADA curb ramp retrofit upgrades, including removal of sidewalk and curb ramps, installation of curb ramps, sidewalk, curb & gutter, pavement patching, reset pedestrian push buttons, striping, traffic control and erosion control on multiple highways in Cheyenne, Elbert, Kit Carson and Lincoln Counties. |
Over Budget- Pending Review |
Pending |
Jan 7 |
NHPP 385A-018 (22437) ~ The project is located in Region 4 in several counties. This project consists of signal pole removal and replacement, pavement removal, concrete pavement, curb and gutter, sidewalk, curb ramps, signing, striping, erosion control and traffic control at the US 24-385 intersection (Rose Ave & Lincoln St) in Burlington. |
K.E.C.I. Colorado Inc. |
Pending |
Jan 7 |
NHPP0502-079 (21572) ~ The project is located in Region 5 in Saguache county. US 50 surface treatment project between mile markers 181.62 to mile marker 192.50 for 10.88 miles. 2-1/2" of new HMA to be placed as well as shouldering material and paving of approaches per M&S. A 400 SY section of roadway may require a deep patch fix of damaged roadway. Structures K-11-F and K-11-H, as shown in the plans, will require geotextile, waterproofing (membrane), concrete sealer, sawing and sealing bridge joint and guardrail and end section removal and replacement items. Signing and striping of roadway will be required once paving is complete. |
APC Southern Construction Co. LLC |
Pending |
Jan 7 |
IM 0253-246 (20952) ~This project is located in Region 4 in Larimer county. The project consists of bridge preventative maintenance on four structures. The work consists of class 1, 2 and 3 repairs, and removal of asphalt, expansion device replacement, placing a thin bonded overlay or HMA overlay, one approach slab replacement, and striping. Three structures are over I-25 at CR 70, CR 66 and CR 58. The last structure is on US 287, MM 352.153, over the Larimer County Canal. |
ABCO Contracting, Inc. |
Pending |
Jan 7 |
MTCE R400-383 (24093) ~This project is locate in Region 4 in several counties. This project will consist of removing and replacing preformed thermoplastic pavement markings along various segments of highway in the SW quadrant of R4. |
Roadsafe Traffic Systems, Inc. |
Pending |
Jan 7 |
MTCE R400-384 (24095) ~The project is located in Region 4 in several counties. This project will remove and replace modified epoxy pavement markings on State Highway 14C. |
RDP Barricade Co., LLC dba Colorado Barricade |
Pending |
Jan 7 |
BR 071A-021 (23005) ~ The project it located in Region 2 in Otero county. The work on this project will consist of one bridge replacement, bridge rail / guardrail replacement and roadway reconstruction for bridge approach. |
TLM Constructors, Inc. |
Pending |