You are here: Home Business Center Civil Rights Programs Assets Design Bid Build Process Guides Design Bid Build Process Guides https://www.codot.gov/business/civilrights/assets/design-bid-build-process-guides-1 https://www.codot.gov/@@site-logo/siteLogo.png Design Bid Build Process Guides 10-5 Update Payments for Non-CUF Activities in B2G (RCRO).pdf 10-6 Upload Completed CDOT Form 1432 in B2G (RCRO) .pdf 11-1 Contractor Notifies DBE of Intent to Terminate or Reduce Commitment.pdf 11-2 Form 1420 Submission for Termination, Reduction, or Substitution and Add Additional DBE Participation (Form 1415), if applicable (Prime Contractor).pdf 11-3 Complete Section C of the CDOT Form 1415 (DBE).pdf 11-4 Review and Complete Section E of the CDOT Form 1420 for Termination, Reduction, or Substitution (RCRO) .pdf 11-5 Review and Complete Section E of the CDOT Form 1420 (PE).pdf 11-6 Upload CDOT Form 1420 and Update Information in B2G.pdf 11-7 Complete CDOT Form 1416 to Document Good Faith Efforts (Prime Contractor).pdf 11-8 Review and Complete Section F of CDOT Form 1416 to document Good Faith Efforts (RCRO).pdf 11-9 Review and Complete Section F of CDOT Form 1416 to document Good Faith Efforts (PE).pdf 12-1 Submit Additional DBE Eligible Participation for Change Order (Prime Contractor).pdf 12-2 Review and Complete Section E of the CDOT Form 1420 and Section D of the CDOT Form 1415, if applicable, for Contract Modification Order (RCRO).pdf 12-3 Review and Complete Section E of the CDOT Form 1420 and Section D of the CDOT Form 1415, if applicable, for Contract Modification Order (PE).pdf 12-4 Upload CDOT Form 1415_1420 and Update Information in B2G (RCRO).pdf 12-5 Complete and Submit CDOT Form 1416 to Document Good Faith Efforts (Prime Contractor).pdf 12-6 Review and Complete Section F of CDOT Form 1416 to document Good Faith Efforts (RCRO).pdf 12-7 Review and Complete Section F of CDOT Form 1416 to document Good Faith Efforts (PE).pdf 4A.47-4A.9 Review, Reject, and Approve a Payroll (Prime Approver Role).pdf 4A-1 Confirm Set Up in LCPtracker (Prime Contractor).pdf Previous 20 items 1 2 3 4 5 6 Next 20 items
Design Bid Build Process Guides https://www.codot.gov/business/civilrights/assets/design-bid-build-process-guides-1 https://www.codot.gov/@@site-logo/siteLogo.png Design Bid Build Process Guides 10-5 Update Payments for Non-CUF Activities in B2G (RCRO).pdf 10-6 Upload Completed CDOT Form 1432 in B2G (RCRO) .pdf 11-1 Contractor Notifies DBE of Intent to Terminate or Reduce Commitment.pdf 11-2 Form 1420 Submission for Termination, Reduction, or Substitution and Add Additional DBE Participation (Form 1415), if applicable (Prime Contractor).pdf 11-3 Complete Section C of the CDOT Form 1415 (DBE).pdf 11-4 Review and Complete Section E of the CDOT Form 1420 for Termination, Reduction, or Substitution (RCRO) .pdf 11-5 Review and Complete Section E of the CDOT Form 1420 (PE).pdf 11-6 Upload CDOT Form 1420 and Update Information in B2G.pdf 11-7 Complete CDOT Form 1416 to Document Good Faith Efforts (Prime Contractor).pdf 11-8 Review and Complete Section F of CDOT Form 1416 to document Good Faith Efforts (RCRO).pdf 11-9 Review and Complete Section F of CDOT Form 1416 to document Good Faith Efforts (PE).pdf 12-1 Submit Additional DBE Eligible Participation for Change Order (Prime Contractor).pdf 12-2 Review and Complete Section E of the CDOT Form 1420 and Section D of the CDOT Form 1415, if applicable, for Contract Modification Order (RCRO).pdf 12-3 Review and Complete Section E of the CDOT Form 1420 and Section D of the CDOT Form 1415, if applicable, for Contract Modification Order (PE).pdf 12-4 Upload CDOT Form 1415_1420 and Update Information in B2G (RCRO).pdf 12-5 Complete and Submit CDOT Form 1416 to Document Good Faith Efforts (Prime Contractor).pdf 12-6 Review and Complete Section F of CDOT Form 1416 to document Good Faith Efforts (RCRO).pdf 12-7 Review and Complete Section F of CDOT Form 1416 to document Good Faith Efforts (PE).pdf 4A.47-4A.9 Review, Reject, and Approve a Payroll (Prime Approver Role).pdf 4A-1 Confirm Set Up in LCPtracker (Prime Contractor).pdf Previous 20 items 1 2 3 4 5 6 Next 20 items
11-2 Form 1420 Submission for Termination, Reduction, or Substitution and Add Additional DBE Participation (Form 1415), if applicable (Prime Contractor).pdf
11-4 Review and Complete Section E of the CDOT Form 1420 for Termination, Reduction, or Substitution (RCRO) .pdf
12-2 Review and Complete Section E of the CDOT Form 1420 and Section D of the CDOT Form 1415, if applicable, for Contract Modification Order (RCRO).pdf
12-3 Review and Complete Section E of the CDOT Form 1420 and Section D of the CDOT Form 1415, if applicable, for Contract Modification Order (PE).pdf